Home
Who We Are
Meet the Team
CAD
Contact Us
Home
Who We Are
Meet the Team
CAD
Contact Us
Search by typing & pressing enter
YOUR CART
Rye Rebuild
Beginning side deck framing
Floor joists and hangers being installed
Hidden fastener, composite Trex decking installed
Drywall hung and tape coat started
Master bathroom floor and shower getting ready for custom tile
Vinyl siding has begun
Color: Certainteed "Midnight Blue"
LVP installed on front half of house
Lower level drywall all done and primed
Second floor drywall all done, walls primed, ceilings painted
Master suite trim all done (except baseboard)
Lower level LVP installed
cabinet installation has begun
island installed & countertop templated
boiler & on demand hot water system
front gable end siding done
kitchen countertops installled
master bath vanity countertop installed
beginning the stairs
stair progress
urethaned handrails and oak treads
rear siding complete
repaired rear deck system
wrapped porch column and added house number
Back to Current Projects
Home