excavation dig
footings poured
foundation poured
wall forms stripped
foundation coated with waterproofing membrane
vapor barrier prepped for slab
slab poured
foundation back filled & rough grade set
foundation backfilled
existing bay bump out removed
bump out demo completed and site protected
structural beam & joists being installed
joists and blocking complete, sheathing begins
deck sheathing complete
first exterior wall in place
all walls framed and stood
all exterior walls sheathed and braced
structural interior walls built and rafters being installed
ready for windows and siding
interior doors installed
bathroom wainscot and chair rail
bathroom tile being installed
prefinished wood floor being installed
electric heat mat installed
electric heat mat floated with 2 coats of thinset